Phase 3 Conveying Line From Hamriyah

Phase 3 Conveying Line From Hamriyah Al Eish - Al Sofn - Al Sabiha Hail

Ministry of Water & Electricity (MOWE)

Projects details

Value

SAR 40,738,026

Civil and construction works of tanks

A

Pump station, pipelines Ductile and HDPE.

B

Construction of 8 tanks 200 M3.

C

Construction of 1 tank 600 M3.

D
تتكون مؤسستنا من فريق ماهر من المهندسين والمحترفين والمديرين

معلومات الاتصال

  • P.O. Box 156, Abha 61411, Kingdom of Saudi Arabia.
  • info@inshabinaa.com.sa
  • +966 17 240 7000

إتصل بنا

Copyright © 2024 Inshaa & Binaa. all rights reserved.